Production Engineering Exam
Very important exam for petroleum engineer which about artificial lift ,productivity index,sucker rod hydraulic jet pump
![Production Engineering Exam For Apache In iraq]()
![Production Engineering Exam For Apache In iraq]()
Very important exam for petroleum engineer which about artificial lift ,productivity index,sucker rod hydraulic jet pump


➤ All types of available artificial lifting pumps are used to add
additional energy to the natural lifting energy
additional energy to the natural lifting energy
YES NO
➤ The gas lifting technique is used to enhance the well inflow performance. This is achieved by reducing the hydro static head pressure loss.
YES NO
➤ Straight line IPR is better than Vogel IPR for the artificial lifting systems.
YES NO
➤ Pressure gradient curves are used to predict the inflow flow performance where a multi phase flow exists.
Source of Damage Encountered During Drilling Operation.
.....................................................
Source of Damage Encountered During Completion Operation.
.....................................................
Source of Damage Encountered During production Operation.
.....................................................
YES NO
➤ Straight line IPR is better than Vogel IPR for the artificial lifting systems.
YES NO
➤ Pressure gradient curves are used to predict the inflow flow performance where a multi phase flow exists.
YES NO
➤ Absolute open flow is detecting when the bottom hole flowing pressure dropped to zero. YES NO
➤ The production system pressure loss distribution formula for a natural flow well can be stated as below:
Preservior =Δp reservior + Δp borehole + Δp vertical line + Δp surf +Δp choke + p sep
YES NO
➤ Pressure gradient curves affected by the well bore deviation. YES NO
➤ Acid stimulation is use to by-pass the near well bore damage.
YES NO
➤ Positive Displacement is the main design concept of Electric submersible pumps. YES NO
➤ HF acid is the best treatment solution for sand stone reservoirs. YES NO
========================
list2 :
sources of formation damage encountered during drilling & completion operations and 3 damage sources during well production. Briefly indicate how the fluid selection for (matrix) removal treatment will be influenced by the damage source (examples may clarify your answer ). ========================
Answer 3
Source of Damage Encountered During Drilling Operation.
.....................................................
Source of Damage Encountered During Completion Operation.
.....................................................
Source of Damage Encountered During production Operation.
.....................................................
What is the difference between the productivity index&the specific productivity index?
.....................................................
.....................................................
Briefly put in one statement the main design concept and way of adding Energy to the production
system for each of the following artificial lifting system:
* Sucker Rod:-------------------------------------
* Electric Submersible: ---------------------------
* Hydraulic jet pump: ----------------------------
* Progressive Cavity Pump:------------------------
Question4
➤ Answer briefly the following questions by the filling the spaces:
state two applications for the gas lifting system.
a-------------------------------------
b-------------------------------------
➤ state three advantage for the gas lifting system on other artificial lifting systems
a-------------------------------------
b-------------------------------------
c-------------------------------------
Question4
➤ Answer briefly the following questions by the filling the spaces:
state two applications for the gas lifting system.
a-------------------------------------
b-------------------------------------
➤ state three advantage for the gas lifting system on other artificial lifting systems
a-------------------------------------
b-------------------------------------
c-------------------------------------
DOWN LOAD THIS PDF
Production Engineering Exam 2020
Production Engineering Exam 2020